Based on discussions during the Berkeley meeting, I have generated a new
draft (v3.0) of the ALMA Offline Data Processing Requirements document.
This includes the removal of the Pipeline section (to be included in the
ALMA SW-11 Memo under 3.6), abbreviation of the Simulator requirements
(main simulator requirements to go to SW-11 under 3.1-R11 or new section),
and incorporation of assigned priorities.  It appears we had completed
discussion of about 3/4 of the document, and this includes everything with
an assigned priority in this draft - the remainder remains as-is for now.
I will try to go through the remaining sections in the next week or so.

You can find this document at

    http://www.aoc.nrao.edu/~smyers/alma/offline-req/

as myers-report-3.ps

The LaTeX source is myers-report-3.tex

The removed Simulator section, with changes made as we discussed in
Berkeley, can be found as simulation-24jul01.tex
This would be a good start for what to include into the SW-11 doc.  Note
that the priorities assigned here conform to the SW-11 priorities, not the
scheme Ive used in the Offline Reqs.

Comments welcome on this draft, though it might be best to focus on the
things with priorities and wait until I go through the rest before
commenting on those.

   -Steve

-------------------------------------------------------------------------
|:| Steven T. Myers                      |:|  Associate Scientist      |:|
|:| National Radio Astronomy Observatory |:|                           |:|
|:| P.O. Box O                           |:|  1003 Lopezville Rd.      |:|
|:| Socorro, NM 87801                    |:|  Ph:  (505) 835-7294      |:|
|:| smyers@nrao.edu                      |:|  FAX: (505) 835-7027      |:|
|:| http://www.aoc.nrao.edu/~smyers      |:|                           |:|
-------------------------------------------------------------------------